Contractor's LCI execution strategy

A class with identifier http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006135

MetadataThis section provides information about 'PCA_100006135' itself.

Source ontologynorsok-z001
CommentLCI strategy shall as a minimum include the following: - Contractor’s Life Cycle information management organization; - An overall strategy for interaction between internal parties, such as procurement and engineering.; - An overall integration strategy of life cycle information from all parties involved such as external contractors, subcontractors and suppliers; - Contractor shall describe their systems portfolio related to the production and administration of LCI including integration capabilities with the Company systems; - Training strategy of staff in both Company’s and Contractor's LCI tools; - LCI Handover strategy from MC to Commissioning; - Strategy for Material control and SPIR handling; - Contractor's method for LCI quality control and systematic correction of quality issues; - Contractor's method for ensuring delivery of 3D CAD design models throughout the project in compliance with Company’s requirements; - LCI procedures (including): - Procedure for collection, storage, processing, transfer and sharing of LCI; - The procedure for standard documentation handling; - Work procedures for 3D handling as described in Company’s requirements; - The procedure shall include transfer methods, information logistics, systems involved, responsibilities, milestones, quality control, error reporting and rectification; - The procedure for tag scoping for supplier packages; - The procedure for tag scoping for engineering; - List containing Contractors planned deliveries of LCI according to Company's requirements; - Time schedules showing LCI deliveries including 3D; - Procedures or method to ensure special attention to identify early access and QC milestones. The schedules shall reflect the project execution plan and time schedules; - Procedure for LCI progress reporting according to LCI time schedules; - Procedures and checklists to ensure quality and completeness of the LCI delivery including maintenance of LCI during MC & commissioning; - Procedure for handling of "mark-ups" from construction and MC & commissioning.

Describe work process for continuous transfer of LCI covering:

  • Project revisions of documents and drawings;
  • Tag information (including tag-doc references);
  • Continuous updates of 3D CAD information according to Company’s requirements;
  • Before issuing safety critical documents and single line diagram in IFC revision, tag information (in Company’s LCI systems) for tags shown on document/drawing shall as a minimum include tag no, description, area, discipline, system and PO references, cross references tag/tag, tag/doc relation.
NORSOK Z-001 rationaleA document to describe the method and timeline to deliver the required LCI during project execution and final handover to operations, in accordance with Client LCI requirments.
NORSOK Z-001 interests stakeholder categoryproject management and engineering
NORSOK Z-001 describes structural elementFacility
NORSOK Z-001 definitionLCI strategy shall as a minimum include the following: - Contractor’s Life Cycle information management organization; - An overall strategy for interaction between internal parties, such as procurement and engineering.; - An overall integration strategy of life cycle information from all parties involved such as external contractors, subcontractors and suppliers; - Contractor shall describe their systems portfolio related to the production and administration of LCI including integration capabilities with the Company systems; - Training strategy of staff in both Company’s and Contractor's LCI tools; - LCI Handover strategy from MC to Commissioning; - Strategy for Material control and SPIR handling; - Contractor's method for LCI quality control and systematic correction of quality issues; - Contractor's method for ensuring delivery of 3D CAD design models throughout the project in compliance with Company’s requirements; - LCI procedures (including): - Procedure for collection, storage, processing, transfer and sharing of LCI; - The procedure for standard documentation handling; - Work procedures for 3D handling as described in Company’s requirements; - The procedure shall include transfer methods, information logistics, systems involved, responsibilities, milestones, quality control, error reporting and rectification; - The procedure for tag scoping for supplier packages; - The procedure for tag scoping for engineering; - List containing Contractors planned deliveries of LCI according to Company's requirements; - Time schedules showing LCI deliveries including 3D; - Procedures or method to ensure special attention to identify early access and QC milestones. The schedules shall reflect the project execution plan and time schedules; - Procedure for LCI progress reporting according to LCI time schedules; - Procedures and checklists to ensure quality and completeness of the LCI delivery including maintenance of LCI during MC & commissioning; - Procedure for handling of "mark-ups" from construction and MC & commissioning.

Describe work process for continuous transfer of LCI covering:

  • Project revisions of documents and drawings;
  • Tag information (including tag-doc references);
  • Continuous updates of 3D CAD information according to Company’s requirements;
  • Before issuing safety critical documents and single line diagram in IFC revision, tag information (in Company’s LCI systems) for tags shown on document/drawing shall as a minimum include tag no, description, area, discipline, system and PO references, cross references tag/tag, tag/doc relation.
skos:broadMatchproject control information
planning information
skos:broaderStrategy