DFI resumes
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006162
Source ontology | norsok-z001 |
Comment | DFI resumes shall be produced in English and in accordance with this standard. The requirement for DFI resume applies to all locations. Independent resumes to be made for each major unit or system of the installation, dependant of size and complexity. The Contractor shall incorporate relevant material from their sub-contractors. The Fabrication- and Installation-parts shall mainly concentrate on non-conformances from design/fabrication criteria, specifications, etc. Further, areas should be highlighted where special attention in the operational phase is recommended due to e.g. difficult repairs, unexpected large loads or other unforeseen events. Only a brief description of the work performed shall be included. Information of foundation performance during installation being relevant for lifetime extension and/or removal shall be included. The required information will depend on foundation system (e.g. pile driving records, suction during penetration, drag lengths vs. tension, penetration during pre-loading). DFI resumés shall be prepared for:
|
NORSOK Z-001 rationale | The Design, Fabrication and Installation (DFI) resumés shall provide Operations with a general summary of the installation based on the most relevant information from the design, fabrication and installation phases, and contain information required for plant integrity management and maintenance planning of the facilities throughout the entire lifetime of the installation. The document shall also serve as an aid in the consideration of measures to be taken if the condition monitoring reveals that the installation is damaged or deviates from the acceptance criteria. |
NORSOK Z-001 interests stakeholder category | structural engineering |
subsea engineering | |
NORSOK Z-001 describes structural element | Equipment |
NORSOK Z-001 definition | DFI resumes shall be produced in English and in accordance with this standard. The requirement for DFI resume applies to all locations. Independent resumes to be made for each major unit or system of the installation, dependant of size and complexity. The Contractor shall incorporate relevant material from their sub-contractors. The Fabrication- and Installation-parts shall mainly concentrate on non-conformances from design/fabrication criteria, specifications, etc. Further, areas should be highlighted where special attention in the operational phase is recommended due to e.g. difficult repairs, unexpected large loads or other unforeseen events. Only a brief description of the work performed shall be included. Information of foundation performance during installation being relevant for lifetime extension and/or removal shall be included. The required information will depend on foundation system (e.g. pile driving records, suction during penetration, drag lengths vs. tension, penetration during pre-loading). DFI resumés shall be prepared for:
|
skos:broader | Manuals |