PCA Reference Data and Services
Toggle Dark/Light/Auto modeToggle Dark/Light/Auto modeToggle Dark/Light/Auto mode

Manufacturing record book (MRB) for linepipe

A class with identifier http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006310

MetadataThis section provides information about 'PCA_100006310' itself.

Source ontologynorsok-z001
CommentIf the documentation normally contained in MRB is issued separately, a reference to such documents is sufficient in the MRB.

MRB requirements:

  • The manufacturer's standard MRB shall be delivered.
  • If additional documents required by Company, then they should be submitted as separate deliverables.

<Please see Word-document for table/akva>

Any of the sections that are not applicable shall be marked “N/A”. The structure and the numbering shall remain as shown above.

Note:

Section 1: The MRB sections shall be delivered as one document (ref SR-15819 - PDF). Each section can be delivered as separate files, named "Doc. No.-sectionx" (Dxxx-xx-…-section1.pdf, Dxxx-xx-…-section9.xlsx, Dxxx-xx-…-section9.pdf, etc).

Section 4 and 9: Reference to SPTS in the MDR index

Section 3: Shall as a minimum refer to Company requirements contained in latest revision of the following documents:

  • Applicable Frame Agreement and purchase order
  • Applicable Specifications, Project-specific Material Data Sheet (PMDS) and Technical Changes (TC)
  • Reference standard (if specified: DNVGL-ST-F101, including amendments and corrections
  • Applicable SPTS specifications
NORSOK Z-001 rationaleTo demonstrate that the requirements with respect to design, calculation, production, testing and possible specified traceability requirements for materials and fabrication, are fulfilled.
NORSOK Z-001 interests stakeholder categorysubsea engineering
piping engineering
NORSOK Z-001 describes structural elementEquipment
NORSOK Z-001 definitionIf the documentation normally contained in MRB is issued separately, a reference to such documents is sufficient in the MRB.

MRB requirements:

  • The manufacturer's standard MRB shall be delivered.
  • If additional documents required by Company, then they should be submitted as separate deliverables.

<Please see Word-document for table/akva>

Any of the sections that are not applicable shall be marked “N/A”. The structure and the numbering shall remain as shown above.

Note:

Section 1: The MRB sections shall be delivered as one document (ref SR-15819 - PDF). Each section can be delivered as separate files, named "Doc. No.-sectionx" (Dxxx-xx-…-section1.pdf, Dxxx-xx-…-section9.xlsx, Dxxx-xx-…-section9.pdf, etc).

Section 4 and 9: Reference to SPTS in the MDR index

Section 3: Shall as a minimum refer to Company requirements contained in latest revision of the following documents:

  • Applicable Frame Agreement and purchase order
  • Applicable Specifications, Project-specific Material Data Sheet (PMDS) and Technical Changes (TC)
  • Reference standard (if specified: DNVGL-ST-F101, including amendments and corrections
  • Applicable SPTS specifications
skos:broadMatchvalidation and verification information
skos:broaderTechnical data
Report

ConstraintsThis section lists constraints that members of 'PCA_100006310' shall satisfy.

ContextThis section provides super- and subtypes as well as members of 'PCA_100006310'.