Piping fabrication records
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006375
Source ontology | norsok-z001 |
Comment | The following list shows the deliverables and structure of the fabrication records for piping:
- Index of design drawings with reference to relevant fabrication drawings (Index of design drawings to be delivered in XLS format additionally to PDF);
- Index of design-, material-, fabrication specifications, documents and data sheets (*);
- Welding procedure specifications (*);
- Welding procedure qualification records (*);
- Repair procedures and specifications (*);
- Repair and deviation reports. All alternative testing shall be documented with full traceability to the applicable welds;
- Weld summary index;
- Material identification system (*);
- Material certificates (apply for pressurized Piping materials) (*);
- Pressure test certificates/documentation (*);
- PMI reports (*);
- PWHT reports (*);
- As-built Design Contractor originated design drawings, mark-ups;
- As-built fabrication drawings/ISOs mark-ups;
- Third Party verification reports;
- Procedure for:
- Tensioning/torqueing of flange stud bolts (*);
- Flushing and cleaning (*);
- Hydro testing (*);
- Hydro flushing of riser- and pipeline valves (*);
- Pneumatic flushing (*);
- Pressurised air shock blowing (PAS) (*);
- Soft Pigging (*);
- Chemical cleaning (*);
- Hot oil flushing (*);
- Internal cleaning of pipe after completed fabrication (*);
- Bending/flaring (*);
- Chemical cleaning documentation (*);
- Hot oil flushing documentation (*). (*) Can be omitted in modifications if retained by modification Contractor |
NORSOK Z-001 rationale | FRB User guide - Describes the content of each deliverable in the FRB and how they relate and refer to each other. Include examples (images) of how to trace welds and material certificates from fabrication drawings/ISOs; |
NORSOK Z-001 interests stakeholder category | piping engineering |
NORSOK Z-001 describes structural element | Equipment |
NORSOK Z-001 definition | The following list shows the deliverables and structure of the fabrication records for piping:
- Index of design drawings with reference to relevant fabrication drawings (Index of design drawings to be delivered in XLS format additionally to PDF);
- Index of design-, material-, fabrication specifications, documents and data sheets (*);
- Welding procedure specifications (*);
- Welding procedure qualification records (*);
- Repair procedures and specifications (*);
- Repair and deviation reports. All alternative testing shall be documented with full traceability to the applicable welds;
- Weld summary index;
- Material identification system (*);
- Material certificates (apply for pressurized Piping materials) (*);
- Pressure test certificates/documentation (*);
- PMI reports (*);
- PWHT reports (*);
- As-built Design Contractor originated design drawings, mark-ups;
- As-built fabrication drawings/ISOs mark-ups;
- Third Party verification reports;
- Procedure for:
- Tensioning/torqueing of flange stud bolts (*);
- Flushing and cleaning (*);
- Hydro testing (*);
- Hydro flushing of riser- and pipeline valves (*);
- Pneumatic flushing (*);
- Pressurised air shock blowing (PAS) (*);
- Soft Pigging (*);
- Chemical cleaning (*);
- Hot oil flushing (*);
- Internal cleaning of pipe after completed fabrication (*);
- Bending/flaring (*);
- Chemical cleaning documentation (*);
- Hot oil flushing documentation (*). (*) Can be omitted in modifications if retained by modification Contractor |