Ready for operation (RFO) close out report
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006409
Source ontology | norsok-z001 |
Comment | All records and documents produced as a result of the monitoring and control requirements and the acceptance criteria shall, on completion of the work, be compiled into a Closeout Report. The Closeout Report shall be divided into sections as follows: Section 1 This section shall give an introduction, general description of the system made ready for operation, list the chemicals used and describe the purpose of - and the structure of the Closeout Report. Section 2 This section shall contain the reports from the RFO operations. It shall contain summaries of events for all the operations and associated field operational paperwork. Section 3 This section shall contain all the operational procedures and field queries (FQs) for the operations associated with the RFO operations. Section 4 This section shall contain the RFO Contractors daily reports generated at the different sites where activities have been performed. These reports shall contain the day-by-day activities, , an environmental report listing the volumes of chemicals on site and a radioactive isotope form, listing the amount of isotopes in the field. |
NORSOK Z-001 rationale | A close out report shall be delivered to document the work performed. |
NORSOK Z-001 interests stakeholder category | pipeline engineering |
NORSOK Z-001 describes structural element | Facility |
NORSOK Z-001 definition | All records and documents produced as a result of the monitoring and control requirements and the acceptance criteria shall, on completion of the work, be compiled into a Closeout Report. The Closeout Report shall be divided into sections as follows: Section 1 This section shall give an introduction, general description of the system made ready for operation, list the chemicals used and describe the purpose of - and the structure of the Closeout Report. Section 2 This section shall contain the reports from the RFO operations. It shall contain summaries of events for all the operations and associated field operational paperwork. Section 3 This section shall contain all the operational procedures and field queries (FQs) for the operations associated with the RFO operations. Section 4 This section shall contain the RFO Contractors daily reports generated at the different sites where activities have been performed. These reports shall contain the day-by-day activities, , an environmental report listing the volumes of chemicals on site and a radioactive isotope form, listing the amount of isotopes in the field. |
skos:broader | Report |