PCA Reference Data and Services
Toggle Dark/Light/Auto modeToggle Dark/Light/Auto modeToggle Dark/Light/Auto mode

System and operation documents

A class with identifier http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006478

MetadataThis section provides information about 'PCA_100006478' itself.

Source ontologynorsok-z001
CommentThe index structure of the System documents shall be as follows: 1 Objective and target group 2 System description 2.1 Introduction 2.2 Design basis 2.3 Process description 2.4 Process control 3 System operation (Opr) (Link to main Operation document for the actual system) 4 System protection 4.2 System control 4.3 Equipment protection 5 Technical data and drawings 6 Additional information 6.1 Definitions and abbreviations 6.2 Changes from previous version 6.3 References

The index structure of the main operating document shall be as follows: Link to S-document for the actual system 3 System operation 3.1 Normal operation 3.2 Normal start-up 3.3 Normal shut down 3.4 Special operations 3.5 Operational routines

Local language: YES

NORSOK Z-001 rationaleSystem documents: The objective of the System documents is to describe the systems at a plant for learning purpose. The System document is a compilation of technical information (LCI), functional descriptions, reason for choice of design and describes the System characteristics, regulate how to operate and protect the System in various conditions. This shall apply to all disciplines within all systems.

The System documents (S-documents) apply for all systems, subsystems and assemblies. One document shall be produced for each system.

The main target group for System documents are mainly operational and maintenance personnel at a plant.

The System documents shall be produced in local language.

Operation documents: The objective of the operating documents is to describe how to operate a system and its equipment in a safe, reliable and effective way.

Operation documents (O-documents) apply for all systems, subsystems and assemblies. One Main Operating document shall be produced for each system.

The "Main Operating document "shall contain a compilation (links to detailed O-documents) of operating procedures according to the index structure shown below.

The operating documents (check lists or operating rules) are formed as action points in tables.

The black start operating documents shall describe the complete sequence starting with "black" installation and ending with main power established. All involved auxiliary systems shall be included and each document shall be related to the Main operating document for each system.

The initial scenario shall be APS for offshore installations (Abandon Platform Shutdown) or Plant evacuation for onshore plants e.g. after a gas leakage, where gas may have entered non-hazardous areas and rooms. The two alternatives: Black start of emergency power /Essential power and black start of UPS shall be described. In case of cable from shore or other independent unit, such as a national grid, and this power is used as a source of emergency power, this alternative method of black start shall also be described. All Operating documents related to Black start shall be provided with a unique Node number.

The main target group for Operational document is mainly operational personnel at a plant.

NORSOK Z-001 interests stakeholder categoryocean engineering
NORSOK Z-001 describes structural elementFresh water
Earthing and lightning
Condensate export line
Battery and no-break
Main power (u = or <1.0 kV)
Ballast water
Gas injection pipeline
Injection water pipeline
Separation and stabilisation
Fire water
Jet fuel
Cooling medium
Material handling
Chemical injection
Drilling
Passive fire protection
Gas compression and re-injection
Fuel gas
Gas export and metering
Control
Environment protection
Sea water
Riser and well topside
Inert gas
Oil storage
Emergency power (u<1.0 kV)
Steam
Gas export pipeline
Emergency power (u = or >1.0 kV)
Closed drain
Glycol / methanol regeneration
Drilling drain
Sewage treatment
Chemical injection pipeline
Heating medium
Flare
Drilling process
Gas treatment
Gas sweetening
Emergency shutdown and blow down
Methanol injection
Diesel oil
Oil export line
Main power (1.0 kV< u < 6.6 kV)
Drilling control and monitoring
Hydraulic power
Wellstream pipeline
Open drain
Subsea installation - maintenance and work over
Fire and gas detection
Thruster and propulsion
Loading
Well and riser subsea
Fire fighting
Lubrication oil
Crude handling and metering
Oily water
Gas conditioning
Telecommunication
Emergency preparedness
Water injection
Main power (u =or >6.6 kV)
Chlorination
Drilling well control
Compressed air
NORSOK Z-001 definitionThe index structure of the System documents shall be as follows: 1 Objective and target group 2 System description 2.1 Introduction 2.2 Design basis 2.3 Process description 2.4 Process control 3 System operation (Opr) (Link to main Operation document for the actual system) 4 System protection 4.2 System control 4.3 Equipment protection 5 Technical data and drawings 6 Additional information 6.1 Definitions and abbreviations 6.2 Changes from previous version 6.3 References

The index structure of the main operating document shall be as follows: Link to S-document for the actual system 3 System operation 3.1 Normal operation 3.2 Normal start-up 3.3 Normal shut down 3.4 Special operations 3.5 Operational routines

Local language: YES

skos:broadMatchfunction describing information
system overview information
skos:broaderOperational information

ConstraintsThis section lists constraints that members of 'PCA_100006478' shall satisfy.

ContextThis section provides super- and subtypes as well as members of 'PCA_100006478'.