Weld summary index
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006531
Source ontology | norsok-z001 |
Comment | The minimum requirements for this index are described below: 1. Weld no. inclusive Weld repair no. 2. Welder no. 3. Ref. to fabrication-, shop- and/or isometric drawing 4. Piping system and line no. 5. PWHT (Post Weld Heat Treatment); i.e. procedures and temperature-time records 6. WPS no. (with reference to WPQR no.) 7. Weld repair log 8. Non-Destructive Test (NDT) extent in % for different methods (e.g. UT, RT, MT, PT) 9. Visual inspection (e.g. on completed weld) 10. Weld inspection (e.g. QC activities; weld preparation, tack welding, parameter verification, consumable control, field metallographic verification, etc.) 11. NDT report number / Inspection report number 12. Weld completion time/date and NDT time/date 13. PMI (Positive Material Identification) report 14. Production tests (destructive testing when applicable) 15. Special procedures (e.g. cleaning/pickling, grinding or hammer peening of weld toe, straightening) |
NORSOK Z-001 rationale | It shall be prepared on basis of the weld numbering system, starting with the lowest weld number. The list shall be prepared prior to start of welding and NDE, and updating shall be parallel to execution of welding and NDE. |
NORSOK Z-001 definition | The minimum requirements for this index are described below: 1. Weld no. inclusive Weld repair no. 2. Welder no. 3. Ref. to fabrication-, shop- and/or isometric drawing 4. Piping system and line no. 5. PWHT (Post Weld Heat Treatment); i.e. procedures and temperature-time records 6. WPS no. (with reference to WPQR no.) 7. Weld repair log 8. Non-Destructive Test (NDT) extent in % for different methods (e.g. UT, RT, MT, PT) 9. Visual inspection (e.g. on completed weld) 10. Weld inspection (e.g. QC activities; weld preparation, tack welding, parameter verification, consumable control, field metallographic verification, etc.) 11. NDT report number / Inspection report number 12. Weld completion time/date and NDT time/date 13. PMI (Positive Material Identification) report 14. Production tests (destructive testing when applicable) 15. Special procedures (e.g. cleaning/pickling, grinding or hammer peening of weld toe, straightening) |
skos:broadMatch | items listing |
objects listing | |
skos:broader | List/Index |