Cause & effect (C&E)
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006115
MetadataThis section provides information about 'PCA_100006115' itself.
Source ontology | norsok-z001 |
Comment | The C&E Diagram shall be prepared as a matrix between initiating (input) and actuated elements (output) performing the corrective action. Both input and output shall be identified by ENS tag numbers. In addition, the following information shall be given for each input/output:n - Tag number, Initiator/Actuator, Value, Note, Service description.n - Reference drawing number (e.g. Piping & instrument diagram).nnNote: The cause and effect for the fire and gas detection system is included in the Fire protection data sheet (FPDS). |
NORSOK Z-001 rationale | The purpose of Cause & Effect (C&E) Diagram is to define logic control and shutdown functions. |
NORSOK Z-001 interests stakeholder category | instrumentation engineering |
subsea engineering | |
NORSOK Z-001 describes structural element | Fire and gas detection |
Fire water | |
Fire fighting | |
Emergency shutdown and blow down | |
Main power (u =or >6.6 kV) | |
Main power (1.0 kV< u < 6.6 kV) | |
Main power (u = or <1.0 kV) | |
Emergency power (u = or >1.0 kV) | |
Emergency power (u<1.0 kV) | |
Battery and no-break | |
Telecommunication | |
Control | |
NORSOK Z-001 definition | The C&E Diagram shall be prepared as a matrix between initiating (input) and actuated elements (output) performing the corrective action. Both input and output shall be identified by ENS tag numbers. In addition, the following information shall be given for each input/output:n - Tag number, Initiator/Actuator, Value, Note, Service description.n - Reference drawing number (e.g. Piping & instrument diagram).nnNote: The cause and effect for the fire and gas detection system is included in the Fire protection data sheet (FPDS). |
skos:broadMatch | functional time and sequence information |
skos:broader | Cause and effect |