Final inspection and test reports
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006210
MetadataThis section provides information about 'PCA_100006210' itself.
Source ontology | norsok-z001 |
Comment | Final inspection reports:nnA final inspection program shall be performed for the subsea system prior to delivery to Company. The inspection program shall:n - Identify status of all equipment upon delivery;n - Valve status (shut/open);n - Connection point status (permanent/temporary clamps);n - Status hatches;n - Pressure equalization system connection points;n - Verification of tubular ventilation ports. nnTest reports:n - All operations to be tested during assembly shall be identified with a test procedure;n - The individual testing program operations shall be signed out by Contractor. Company shall sign the overall test program upon completion. |
NORSOK Z-001 interests stakeholder category | subsea engineering |
NORSOK Z-001 describes structural element | Equipment |
NORSOK Z-001 definition | Final inspection reports:nnA final inspection program shall be performed for the subsea system prior to delivery to Company. The inspection program shall:n - Identify status of all equipment upon delivery;n - Valve status (shut/open);n - Connection point status (permanent/temporary clamps);n - Status hatches;n - Pressure equalization system connection points;n - Verification of tubular ventilation ports. nnTest reports:n - All operations to be tested during assembly shall be identified with a test procedure;n - The individual testing program operations shall be signed out by Contractor. Company shall sign the overall test program upon completion. |
skos:broadMatch | validation and verification information |
skos:broader | Report |