Process system engineering manuals
A class with identifier
http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006398
Source ontology | norsok-z001 |
Comment | Table of contents: 1 Objective and target group 2 System description 2.1 Introduction 2.2 Design basis 2.3 Process description 2.4 Utility systems, chemicals and catalyst requirements 2.5 Analysis (sampling points, etc.) 2.6 HSE requirements 3 System operation, including process control 3.1 Normal operation 3.2 Normal start-up 3.3 Normal shut down 3.4 Special operations 3.5 Routine operations 4 Maintenance 4.1 Depressurization and flushing 4.2 Maintenance 5 System protection 5.1 Premises 5.2 Process and emergency shut-down functions 5.3 Specific equipment protection 5.4 Pressure safety equipment (relief valves, rupture disks, etc.) 5.5 Car seals, key locks and key interlocks 6 Specific design solutions 7 Technical data, calculations and drawings 8 Additional information 8.1 Definitions and abbreviations 8.2 Changes from previous version 8.3 References Section 4 shall describe maintenance sequence, including how to shut down and drain equipment and parts of the system, relevant conclusions from HAZOP and other evaluations, and any other relevant considerations; reference to supplier documentation for individual equipment maintenance procedures can be done in addition. Section 5 shall include a list of all the isolation valves located in the pressure-relief system piping which could isolate pressure relief valves in the system. The required position and the reason for the lock or the seal shall be included. Section 6 shall give details about the specific design solutions chosen for equipment, instrumentation and materials. The reasoning behind the specific design solutions shall also be given in this section, e.g. the reason for choosing a specific level control instrument, the specific compressor configuration, the specific heat exchanger configuration etc. Any limitations to the operation caused by the e.g. the material selection or e.g. the design capacity shall be explained in this section. This could be low or high temperature limitations, throughput limitations for heat exchangers, operating conditions which reduce the lifetime of an equipment unit etc. Section 7 shall include the relevant technical data, calculations and drawings not covered by a reference to a separate document in section 8.3. Section 8.2 shall be used to log the performed modifications affecting the described system design and operation. For a new built installation this section will be empty. For a modification this section shall describe the changes resulting from the modification only once, i.e. changes between the versions issued internally throughout the modification project shall not be commented. |
NORSOK Z-001 rationale | One process system engineering manual shall be written for each process system (e.g. oil separation system, gas compression system, open drain system, freshwater system, flare system, etc.). The objective of the manuals is to describe and document the design and operation of the system. |
NORSOK Z-001 interests stakeholder category | process engineering |
NORSOK Z-001 describes structural element | Flare |
Gas injection pipeline | |
Gas sweetening | |
Cooling medium | |
Chlorination | |
Condensate export line | |
Drilling control and monitoring | |
Chemical injection pipeline | |
Fire water | |
Diesel oil | |
Fresh water | |
Chemical injection | |
Subsea installation - maintenance and work over | |
Gas treatment | |
Drilling process | |
Fuel gas | |
Wellstream pipeline | |
Gas export and metering | |
Hydraulic power | |
Jet fuel | |
Ballast water | |
Methanol injection | |
Well and riser subsea | |
Riser and well topside | |
Gas compression and re-injection | |
Open drain | |
Loading | |
Oil export line | |
Injection water pipeline | |
Fire fighting | |
Thruster and propulsion | |
Oil storage | |
Drilling well control | |
Lubrication oil | |
Inert gas | |
Drilling | |
Oily water | |
Sea water | |
Drilling drain | |
Gas conditioning | |
Crude handling and metering | |
Heating medium | |
Glycol / methanol regeneration | |
Gas export pipeline | |
Water injection | |
Compressed air | |
Steam | |
Closed drain | |
Separation and stabilisation | |
Sewage treatment | |
NORSOK Z-001 definition | Table of contents: 1 Objective and target group 2 System description 2.1 Introduction 2.2 Design basis 2.3 Process description 2.4 Utility systems, chemicals and catalyst requirements 2.5 Analysis (sampling points, etc.) 2.6 HSE requirements 3 System operation, including process control 3.1 Normal operation 3.2 Normal start-up 3.3 Normal shut down 3.4 Special operations 3.5 Routine operations 4 Maintenance 4.1 Depressurization and flushing 4.2 Maintenance 5 System protection 5.1 Premises 5.2 Process and emergency shut-down functions 5.3 Specific equipment protection 5.4 Pressure safety equipment (relief valves, rupture disks, etc.) 5.5 Car seals, key locks and key interlocks 6 Specific design solutions 7 Technical data, calculations and drawings 8 Additional information 8.1 Definitions and abbreviations 8.2 Changes from previous version 8.3 References Section 4 shall describe maintenance sequence, including how to shut down and drain equipment and parts of the system, relevant conclusions from HAZOP and other evaluations, and any other relevant considerations; reference to supplier documentation for individual equipment maintenance procedures can be done in addition. Section 5 shall include a list of all the isolation valves located in the pressure-relief system piping which could isolate pressure relief valves in the system. The required position and the reason for the lock or the seal shall be included. Section 6 shall give details about the specific design solutions chosen for equipment, instrumentation and materials. The reasoning behind the specific design solutions shall also be given in this section, e.g. the reason for choosing a specific level control instrument, the specific compressor configuration, the specific heat exchanger configuration etc. Any limitations to the operation caused by the e.g. the material selection or e.g. the design capacity shall be explained in this section. This could be low or high temperature limitations, throughput limitations for heat exchangers, operating conditions which reduce the lifetime of an equipment unit etc. Section 7 shall include the relevant technical data, calculations and drawings not covered by a reference to a separate document in section 8.3. Section 8.2 shall be used to log the performed modifications affecting the described system design and operation. For a new built installation this section will be empty. For a modification this section shall describe the changes resulting from the modification only once, i.e. changes between the versions issued internally throughout the modification project shall not be commented. |
skos:broadMatch | instructive information |
skos:broader | Manuals |
Process |