PCA Reference Data and Services
Toggle Dark/Light/Auto modeToggle Dark/Light/Auto modeToggle Dark/Light/Auto mode

Site plan

A class with identifier http://rds.posccaesar.org/ontology/plm/rdl/PCA_100006444

MetadataThis section provides information about 'PCA_100006444' itself.

Source ontologynorsok-z001
CommentThe Site plan shall be based on a digital terrain model and shall include necessary layers to present (often provided as 2D input): - Geotechnical and geological features/strata; - Areas with registration of contaminated soil; - All plant functional areas/blocks including offsite; - Cavern, tunnel and shaft systems; - Areas defined for future plant development; - Areas that will have to be controlled or restricted during plant operations; - Levelled areas as a result of cut and fill; - Protective structures at sea, towards river and hinterland; - Plant road system including escape routes; - Plant main interconnecting pipe racks; - Plant fence lines and gates; - Outside plant local infrastructure and plant battery limits (roads, railways, port, pipelines, cables and overhead lines, etc.); - Permanent lay down and rig areas for future construction and turnaround activities; - Construction lay down areas and areas for temporary construction workshops, offices, accommodation, parking and holding areas; - Areas for permanent and temporary disposal of surplus materials; - Neighbouring settlements and use of land; - Areas that shall remain protected or with restriction to access (like nature reserves, historical monuments, archaeological sites); - Property borders; - Industrial zoning as per authority approvals.
NORSOK Z-001 interests stakeholder categorycivil engineering
NORSOK Z-001 describes structural elementLocation
NORSOK Z-001 definitionThe Site plan shall be based on a digital terrain model and shall include necessary layers to present (often provided as 2D input): - Geotechnical and geological features/strata; - Areas with registration of contaminated soil; - All plant functional areas/blocks including offsite; - Cavern, tunnel and shaft systems; - Areas defined for future plant development; - Areas that will have to be controlled or restricted during plant operations; - Levelled areas as a result of cut and fill; - Protective structures at sea, towards river and hinterland; - Plant road system including escape routes; - Plant main interconnecting pipe racks; - Plant fence lines and gates; - Outside plant local infrastructure and plant battery limits (roads, railways, port, pipelines, cables and overhead lines, etc.); - Permanent lay down and rig areas for future construction and turnaround activities; - Construction lay down areas and areas for temporary construction workshops, offices, accommodation, parking and holding areas; - Areas for permanent and temporary disposal of surplus materials; - Neighbouring settlements and use of land; - Areas that shall remain protected or with restriction to access (like nature reserves, historical monuments, archaeological sites); - Property borders; - Industrial zoning as per authority approvals.
skos:broadMatchsite information
skos:broaderPlan (Drawing not project planning)

ConstraintsThis section lists constraints that members of 'PCA_100006444' shall satisfy.

ContextThis section provides super- and subtypes as well as members of 'PCA_100006444'.